Here’s a quick review of the HPE Renew Technical Remanufacturing Checklist
- There’s an incoming inspection when the product arrives
- Then Reconditioning and assembly with genuine HPE parts
- All of the latest firmware updates are installed
- And a New serial number is assigned
- After all of the Quality checks and testing comes the Final product inspection
- Then it Ships with a same as new HPE or Aruba factory warranty
The checklist below details how the HPE Renew remanufacturing process truly ensures that all products are a true reflection of new Hewlett Packard Enterprise products.
Download your copy of the HPE Renew Technical Overview Whitepaper
Incoming Product Inspection | |||||
1 | Products must pass a cosmetic inspection based on strict HPE Factory Standards. If the parts do not meet the following requirements they are replaced with original HPE new parts: | ||||
On visible front-facing surfaces (Class 1), light scratches must measure less than 6 cm, deep scratches must measure less than 2 mm | |||||
Any areas of blemishes, abrasions or water spots must measure less than 1.5 cm | |||||
Any dents on panels | |||||
Any rusts spots | |||||
2 | System Power up and configuration checks performed | ||||
3 | Validation of parts against Bill of Materials | ||||
4 | Components inspections, such as memory and hard disks must bear manufacturer’s seals of authenticity. Otherwise they are rejected and scrapped for recycling | ||||
5 | All cables and accessories are scrapped for recycling and replaced by new ones | ||||
6 | Perform Engineering Change Notification checks to latest new product factory specifications | ||||
Reconditioning | |||||
7 | Perform disassembly down to sub-assembly level; parts such as fans, power supplies, major cages and I/O panels are cleaned | ||||
8 | Intensive cleaning of all sub-assembly parts and racks | ||||
9 | Removal of labels and regeneration of new product labels | ||||
10 | Minor touch up of external surfaces may occur if needed | ||||
Assembly & Software Installations | |||||
11 | Product component assembly and system integration | ||||
12 | Storage drives reformatted and retested to ensure data integrity. Every drive is wiped clean of any data and every disk is separately overwritten | ||||
13 | Restore Factory Default settings and reset all password settings | ||||
14 | Restore licensed version of Operating System Software and install latest Firmware updates | ||||
Product Functional Test | |||||
15 | Coverage | Static Testing | Dynamic Testing | ||
Configuration and System Settings | Product Configuration Checks | ||||
Hardware checks via system LED/LCD displays | |||||
Unit Serial number Update | |||||
System and I/O firmware verification and updates | |||||
Fans | Fan Status checks | ||||
CMOS | Random Data Pattern Tests | ||||
PCI Bus/Serial Port/USB Devices | Detect and Read tests | ||||
Temperature Status | Temperature Caution Tests | ||||
Peripheral Interconnect Tests | All Hot-plug Hard disk slots Interconnectivity tests | ||||
DVD/CD-ROM boot and O/S installation checks | |||||
LAN connectivity | |||||
Processor | CPU clock speed | Real-time clock test cycles | |||
Up to 24-hr run-in tests | |||||
Memory | Memory Size and Slot Test | Random Address Tests | |||
Read/Write Test | |||||
March/Noise/Walk/ECC Tests | |||||
Up to 24-hr run-in tests | |||||
16 | SCSI Adaptors, Fibre Channel Host Bus adapters, SAN switches, LAN etc, are tested where options apply | ||||
17 | Mandatory electrical safety Hipot/Ground bond tests | ||||
Final Product Inspection And Deliverables | |||||
18 | Archive Test logs and Product Manifest Outputs for Test status Verifications | ||||
19 | Include newest versions of product documentations and/or CD kits | ||||
20 | Optional provision of racking services for Storage and Server products, inclusive of Power Distribution Unit cabling works | ||||
21 | Re-packaging in new HPE boxes or wood crates as per HPE Factory standard packaging procedures | ||||
22 | The Warranty period is reset in the HPE Worldwide Service Database upon shipment date | ||||
23 | Product is ready for delivery and installation |